| Operation Principle |

| Removal |
| 1. | Disconnect the vapor hose (A). |
| 2. | Remove the PCV valve (B).
|
| Inspection |
| 1. | Insert a thin stick (A) into the PCV valve (B) from the threaded side to check for plunger movement.
|
| Installation |
| 1. | Install in the reverse order of removal. |
Schematic diagrams Schematic Diagram Repair procedures Inspection 1. After disconnecting the vapor hose from the PCV valve, remove the PCV valve.
Description and operation Description Evaporative Emission Control System prevents fuel vapor stored in fuel tank from vaporizing into the atmosphere.
Components and components location Component Schematic diagrams Circuit Diagram [Folding Mirror Type] [Non-Folding Mirror Type] Repair procedures Inspection 1.Check for continuity between the terminals in each switch position according to the table.
Specifications Specifications Smart Key Unit Items Specification Rated voltage DC 12 V Operating voltage DC 9 - 16 V Operating temperature -31 - 167°F (-35 - 75°C) Load Max. 4mA (When welcome light function "OFF") RF Receiver Items